National Repository of Grey Literature 32 records found  1 - 10nextend  jump to record: Search took 0.01 seconds. 
Facility management as support of user of buildings
Krůta, Vítězslav ; Bárta, Matěj (referee) ; Tichá, Alena (advisor)
This diploma thesis examines facility management – support services for building users. The theoretical part describes the importance and objectives of facility management, included processes and its development in the world and the Czech Republic. Attention is also given to the currently implemented, the long-awaited standardization in this field. The practical part is the case study that analyses the implementation of facility management on specific building – administrative and commercial centre in Prague. The thesis concludes with design of optimization and extension of support services with respect to the benefits for the building owner and the service supplier.
Analysis of relationships among prices of electricity, supplying services, regulatory energy, carbon dioxide emission allowances and primary sources of energy
Srna, Jan ; Čambala, Petr (referee) ; Macháček, Jan (advisor)
This thesis describes possibilities of electricity trading. The thesis deals with subjects at the electricity market, defines their competences, obligations and relationships among these subjects. Trading places and their advantages and disadvantages are also described in the thesis. The thesis shows composition of the electricity price and informs about its partial components. Types of ancillary services are spoken and there is also comparison between selling wholesale electricity and providing ancillary services. An influence of primary fuels and emission allowances on the electricity price is included at the end of the thesis.
Combi-Cycle with piston engine
Kubik, Martin ; Caha, Tomáš (referee) ; Fiedler, Jan (advisor)
The scope of this diploma thesis of focused on processing and calculation of the technological scheme for combi-cycle power plant with piston engine using heavy fuel oil. There are analyzed demands of piston engine for HFO and design of technological process preparation. This thesis analyzes the suitable locations, service options and alternative solution - heating plant with piston engines. Benefits of each option are assessed in the economic model, assuming power as a source of base load and providing support services. The results are intended to assess feasibility of the investment project.
Electric vehicles as energy storage element for electrical grid
Novák, Martin ; Minařík,, Daniel (referee) ; Baxant, Petr (advisor)
This master´s thesis deals with possibilities of accumulation electric energy with the electric vehicles and their use for electric grid regulation services. In the introduction of this thesis is characterized the current world-wide state of electromobility, including the Czech Republic. Furthermore are summarized main advantages and disadvantages of the expanded involvement of the electric vehicles in the traffic. In the second part if this Master´s thesis the vehicles are divided into three main groups. The third part of the thesis describes the energy storage and generation units used in vehicles. In this part of the script are each of the energy storage parameters compared. The other chapter includes the list of current battery electric vehicles with all their important technical parameters. The fifth chapter summarizes the possibilities of the use of electric vehicles in the Vehicle-to-grid system. This chapter also discusses in detail the ancillary services of the electric grid in the Czech Republic. In the last part of this Master´s thesis there is calculated an economical potential of electric vehicles providing the primary and secondary regulation.
Potential of non-frequency ancillary services for a distribution system operator
Reiskup, Filip ; Holub, Martin (referee) ; Ptáček, Michal (advisor)
This thesis provides a basic overview of the ancillary services in a transmission system. It summarizes changes regarding the implementation of European directives SOGL and EBGL. It describes in detail a portfolio of non-frequency ancillary services used in the distribution systems. It evaluates the demand of E.ON distribution system potential for those services in particular locations. Practical part is focused on a potential of reactive power management in this distribution area. It evaluates reactive power flow into transmission system and indicates the most critical substations. This thesis also covers analysis of existing resources in this distribution area and assign their possible potential in reactive power management.
Role of Czech NPP within grid power regulation
Kostečka, Jan ; Martinec, Jiří (referee) ; Katovský, Karel (advisor)
The aim of the Bachelor’s thesis is the involvement of Czech nuclear power plants in the Czech energy networks, but also in the European Network and their adaptation. Effect of expansion of renewable electrical energy produces the asymmetry in the network and places formed with an excess of electrical energy and places with lack of electrical energy. Flows of electric energy can affect the security and safety of distribution lines. Excessive overloading can cause them to collapse. Therefore, this work is focused on solutions and avoids this problem and minimizes this potential damage. However, the impact of energy revolution has a giant proportion about these overflows network energy. Uncontrollable wind and solar power source may create regionally region surge and flow of this energy goes to areas with shortages of electrical power. The regulation has an impact on fuel. This renegade production could extend fuel cycle, or expand the campaign to more years at least a year. The calculations can show the amount of fuel that can still be used, and thereby increase the yield and economic benefit conditions for extending the life of the reactor units.
Electric boiler connection in heat plant for providing ancillary services
Ditrych, Marek ; Příhoda, Martin (referee) ; Wasserbauer, Vojtěch (advisor)
The bachelor thesis deals with using the electric boiler for extension ancillary services in heating plant. The system and support services are described in the thesis, because the ancillary services regulate an energy deflection. The system and ancillary services are described in the thesis. Thanks to these services an energy deflection is regulated. The thesis describes different types of electric boilers and there functions. In the thesis is shown the possible solution of using an electric boiler in heating plant Opatovice. The cable conduction is designed for a power of electric boiler. For this reason, there is calculated the equivalent warming short-circuit current close to the electric boiler.
Nuclear Power Plant Dukovany Tasks within an Electricity Grid of the Czech Republic
Prokop, Ondřej ; Řež,, Martina Malá, Centrum výzkumu (referee) ; Katovský, Karel (advisor)
The aim of the Bachelor’s thesis is to describe the role of The Nuclear Power Plant Dukovany (Dukovany NPP) in the Czech electricity grid. Increasing of the production of electricity from renewable energy sources in the electricity grid causes more frequently compliance of N-1 criterion and it decrease the reliability of the electricity grid. The risk of Blackout increases, which would cause large economic losses and danger to the life of human beings. Therefore, reliable, good controllable and safety sources of electricity are very important. The first part of the thesis describes the role of Dukovany NPP in the process of regulation of basic electrical parameters during the normal operation of electricity grid. The second part of the thesis deals with states and the function of Dukovany NPP after full or partial disintegration of the electricity grid. Final part analyzes the importance of Dukovany NPP in Czech electricity grid and future development Dukovany NPP with possibility of the construction of new nuclear units after the end of the operation in 2035. The Dukovany NPP is an important regulator of the reactive power. There isn’t other power plant in the southeastern part of the Czech Republic, which could significantly control reactive power. The power from Dukovany NPP, which is provided on ancillary services controlling the real power and frequency has been increasing in recent years. This is due to the increasing production of renewable sources. Units switch to island operation after partial disintegration of electricity grid. If frequency exceeds the limit, the units will switch to it is own consumption. In this stage of operation at own consumption can Dukovany NPP operated without the time limit. Dukovany NPP may participate in restoring the electricity grid, based on dispatch control instruct. If switching to own consumption is not successful and back up sources and emergency’s dieselgenerator are unavailable, the power supply has to be restored as soon as possible. There are six independent solutions to restore the power supply. Next option of restore power supply will be the AAC network after the completion of construction in 2014. The AAC network will be resistant to the extreme weather and will be place it in the area of the power station, thereby Dukovany NPP will be more independent on external network.
Possibilities of Accumulation in Distribution Network
Žižlavský, Jakub ; Pěcha, Jiří (referee) ; Mastný, Petr (advisor)
The Bachelor thesis on the Possibilities of Accumulation in Distribution Network focuses on the distribution of electric energy storage types. Then the most suitable candidate for the application of the accumulation of electricity in the distribution network will be selected and further work will be conceived according to the choice.
Optimization of operating heating and power plant units in the PS
Bezděk, Jakub ; Radil, Lukáš (referee) ; Mastný, Petr (advisor)
This thesis deals with the structure of the electricity transmission system in Europe and their cooperation. Furthermore, it also analyzes the basic types of power plants and heating plants, then describes the optimization of operation of the electricity transmission system, the system services, support services and providing cross-border provision of electricity. Finally, work is the definition of regulatory tools and the example shows the optimal power distribution of two specific blocks for a given load.

National Repository of Grey Literature : 32 records found   1 - 10nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.